Modern two-bedroom new-build with sustainability features and deposit help..
- Two bedrooms, two bathrooms in a 914 sq ft open-plan layout
- Freehold new-build with contemporary finishes throughout
- Solar panels and communal electric-car charging points installed
- 5% deposit contribution and standard flooring included (T&Cs)
- Integrated appliances: fridge-freezer, washer-dryer, gas hob, oven
- Development in regeneration; some local amenities still being built
- Area classed as very deprived — consider current local services
- Show apartment open to view; offer subject to lender acceptance
A bright, two-bedroom new-build apartment at West Craigs Green, designed for energy efficiency and low running costs. The open-plan layout and full specification — including integrated appliances, designer sanitaryware and contemporary finishes — suit first-time buyers or investors seeking modern, low-maintenance living. Solar panels and communal electric-car charging points add sustainable appeal and potential savings on bills.
The development is part of a wider regeneration with new parks and planned local facilities; Meadowfield and Lennie Parks are already in the area, and a primary school, café and health centre are proposed within walking distance. Travel links are good, with bus routes and nearby rail/tram access, and Gyle shopping is within reach for everyday needs.
There is a promotional 5% deposit contribution (terms apply) and standard flooring included for reservations by the offer deadline; this can materially reduce upfront costs but is subject to lender acceptance and other conditions. Buyers should note the site sits in an area currently classed as very deprived, with some local amenities still in development — a consideration for those prioritising established services today.
Overall this 914 sq ft freehold apartment offers contemporary living, strong sustainability features and purchase incentives, balanced by the reality of a neighbourhood in transition. It’s best suited to buyers who value modern specification and long-term growth from local regeneration rather than immediate, fully mature local services.