Cleared consented plots for 30,000–82,000 sq ft industrial development near major routes.
Detailed planning consent granted for plots 8 and 9 (B1/B2/B8)
Plots cleared and ready for immediate construction start
Capacity 30,000–82,000 sq ft of Grade A industrial space
Excellent road links: A34, A303, quick M4/M25 access
Huge plot footprint with extensive parking and loading areas
Development costs and fit-out required; no existing rental income
Planning consent specific to plots 8 and 9 only
No flood risk; low local crime, affluent business location
A rare development opportunity in Andover Business Park: two cleared plots (8 and 9) with detailed planning consent for B1/B2/B8 use, offering between 30,000 and 82,000 sq ft of new industrial/warehouse space. The site benefits from Grade A specification potential, strong transport links (A34, A303, quick access to M4/M25) and a low-crime, affluent catchment — attractive for logistics, distribution or bespoke build-to-suit occupiers.
The plots are cleared and ready to start construction, with planning consent already granted. That saves early-stage risk and shortens delivery timelines, making this suitable for owner-occupiers or investors seeking near-term development. Ample parking, large loading areas and a substantial plot footprint allow flexible layouts and high-capacity operations; solar-ready roofs are feasible given the park’s modern industrial character.
Buyers should factor in construction and fit-out costs, plus typical development obligations such as potential infrastructure or Section 106 requirements. The planning consent applies specifically to plots 8 and 9; other plots are not included. There is no existing income — this is a development site rather than a lettable, income-producing building.
For developers and strategic occupiers who need modern logistics space with fast road connectivity and planning in place, this represents a streamlined route to delivery. For owner-occupiers, the site offers scale and specification potential; for investors, the cleared consented plots reduce entitlement risk but require capital for construction and leasing or sale onward.