Affordable new three-bedroom house with energy-efficient systems and village convenience.
Shared ownership sale — buy 25%–75% share of £195,000 market value
Leasehold tenure — confirm lease length and any service charges
New build (2025) with LABC warranty and modern internal finishes
Energy efficient: private solar panels and air-source heat pump
Private driveway with EV charging point and off-street parking
Large enclosed rear garden with patio, lawn and garden shed
EPC rating pending; council tax band unknown — verify before purchase
Local area shows high deprivation despite very low crime rates
A brand-new three-bedroom semi-detached home offered on a shared ownership basis, ideal for first-time buyers seeking a lower-entry route to home ownership. Built in 2025, the house has modern energy-saving features — private solar panels and an air-source heat pump — designed to reduce running costs. The property includes two bathrooms, spacious living accommodation and a large, level rear garden with patio and shed.
Practical benefits include a private tarmac driveway with an EV charging point, off-street parking and a village-centre location adjacent to Ysgol Preseli. The development is newly completed and comes with an LABC warranty; multiple plots remain available, giving some buyer choice. Broadband is reported as fast and mobile signal average.
Important considerations: this is a leasehold property sold through a shared ownership scheme (purchase between 25% and 75% of market value). The advertised price of £97,500 reflects a share of a £195,000 full market valuation. EPC rating is pending and council tax band is unknown. The wider area records high deprivation indices despite very low local crime — consider local services and long-term resale prospects.
This home suits a buyer prioritising affordability, low running costs and village convenience. It represents a practical, modern starter home with clear energy advantages, but buyers should confirm lease terms, service charges, percentage share options and the pending EPC before proceeding.