NR32 5BG - 4 bed lakeside four bed detached in Waveney, NR32 5BG

View on Property Piper

4 bedroom detached house for sale in Plot 55 Lakeside, Hall Road, Blundeston, Lowestoft, NR32

Summary - Plot 55 Lakeside, Hall Road, Blundeston, Lowestoft, NR32 NR32 5BG

4 bed 2 bath Detached

Energy-efficient, village-edge family house with garden and garage, ready Autumn 2025.
New build detached four-bedroom house, 1,341 sq ft
South-west facing garden with paved patio, good evening light
Energy-efficient: EPC B, A-rated boiler, underfloor heating ground floor
Single garage and block-paved driveway included
Choice of kitchen and tiling subject to stage of construction
Completion scheduled for Autumn 2025; images partly CGI/show home
Freehold tenure; 10-year new build structural warranty included
Council tax band not yet confirmed
Plot 55 at Lakeside, Blundeston is a newly built, 1,341 sq ft detached four-bedroom home finished to a high standard and designed for low running costs. The house combines modern energy-efficient systems — underfloor heating downstairs, an A-rated boiler, double glazing and low-energy lighting — with thoughtful internal fixtures such as oak-veneered doors, Roper Rhodes bathroom fittings and a choice of kitchen finishes (subject to stage of build). South-west facing garden and paved patio provide good afternoon and evening light for family outdoor time.

Situated in a sought-after village on the outskirts of Lowestoft, the development offers easy road and rail access to Lowestoft, Great Yarmouth, Beccles and Norwich. Local amenities include a primary school, village green, playground, and nearby secondary schools with good Ofsted ratings. The development is small and private (38 four-bedroom detached homes), giving a village feel while still being well connected.

Practical positives include a single garage, driveway with block paviours, intruder alarm, external lighting and a 10-year new build structural warranty. The property is freehold, carries an EPC B rating and is built with high-performance insulation and draught-proofing to reduce fuel bills. Completion is scheduled for Autumn 2025, and some internal finishes can still be personalised from the developer’s selected ranges.

Important considerations: this is a new build — some images are CGI or taken from the show home and specifications may be subject to change. Choices for kitchen and tiling depend on the stage of construction. Council tax band is not yet confirmed. Buyers should allow for lead time until Autumn 2025 for completion.

Property Details

Image Descriptions

Floorplan Description

Rooms

Textual Property Features

Target Audience

AI Tags

Detected Visual Features

Nearby Schools

Nearest Bars And Restaurants

,,,,}

Nearest General Shops

,,}

Nearest Grocery shops

,,}

Nearest Supermarkets

,,}

Nearest Religious buildings

,,}

Nearest Medical buildings

,,,}

Nearest Leisure Facilities

,,,,}

Nearest Tourist attractions

,,}

Nearest Train stations

,,,,}

Nearest Bus stations and stops

,,,,}

Nearest Hotels

,,}

Tags

Local Market Stats

Similar Properties

Meta

High Res Images

Compatible Images

Low res Images

Thumbnails

Raw Images

High Res Floorplan Images

Compatible Floorplan Images

Low res Floorplan Images

FloorplanImages Thumbnail

Raw Floorplan Images